Skip to content
Academy ofAI Learning

Store / ISO 27001 Readiness Pack

Claude skill · Compliance and security

Risk assessment and register

A repeatable risk method, scored risks with treatment options and controls, and a dated treatment plan

When Claude uses it (the skill's own description)

Set up a repeatable risk method (scales, criteria, acceptance level) and run it: risks per asset with threat and vulnerability, scores, treatment option (modify, retain, avoid, share), controls, owner and a dated treatment plan. Use when asked to "do the risk assessment", "build the risk register" or "write the treatment plan". Works from the asset register, incidents and known weaknesses.

iso-27001-readiness/skills/risk-assessment-register/SKILL.md

The skill, as Claude reads it

Plain text you can open, read and edit.

# Risk assessment and register

Clause 6.1 asks for a method that gives consistent, comparable results whoever runs it, then the results. The register answers: what could go wrong with each important asset, how badly, and what we have decided to do about it.

## Collect first

1. **Asset register** with owners and C, I, A ratings, or at minimum the list of in-scope systems and data.
2. **Scope and context**: the issues and interested party requirements, since those set what "impact" means here.
3. **What has gone wrong**: incidents, near misses, audit findings, penetration test results, known weaknesses, overdue patches.
4. **Existing controls**: what is already in place (MFA, backups, access reviews, contracts), honestly rated as working, partial or unknown.
5. **Appetite**: the level of risk the leadership will accept, in words if there are no numbers yet.
6. **Risk owners**: who can decide to spend money or change a process in each area.

If no incident history or test results exist, say so and treat likelihood ratings as less certain.

## Method

1. **Criteria first**, written before any risk is scored. Likelihood 1 to 5 with a description per level (for example 1 = not expected within five years, 5 = expected this quarter). Impact 1 to 5 across financial, legal, customer, operational and reputational harm, with pound and time thresholds set by the organisation. Score = likelihood x impact. Acceptance level: the score at or below which a risk may be retained (the leadership chooses; 6 or less of 25 is a common start). Who approves retained risks above the line.
2. **Identify risks** per asset or process of medium or high value as "threat exploits vulnerability causing consequence". Cover at least: unauthorised access, data leakage, ransomware, loss of availability, supplier failure, insider error, physical loss or theft, change gone wrong, legal breach. The asset's C, I, A ratings decide which matter.
3. **Score each risk** with current controls in place, with the reason for each rating written so another person could repeat it.
4. **Treatment option** per risk: modify (add or improve controls), retain (accept, with the approver named), avoid (stop the activity), share (insurance, contract, outsourcing; accountability stays). Every risk above the acceptance level needs a treatment other than retain, or a documented approval.
5. **Controls chosen**: for modify, name the control in the organisation's words with the Annex A reference by number only; the user reads the wording in their licensed copy. The mapping feeds the Statement of Applicability.
6. **Residual risk**: the expected score once treatment is done, with the date expected.
7. **Risk treatment plan**: one line per treatment: risk ID, action, control reference, owner, resources, due date, status, evidence of completion. Sorted by current score, then effort.
8. **Review cycle**: after an incident, a major change or a new supplier, and at least annually; the register shows the last review date and who approved it.

## Output

```
Risk method: <scales, criteria, acceptance level, approval route, review cycle>
Risk register: <table: ID, asset or process, threat, vulnerability, consequence, C/I/A, likelihood, impact, score, existing controls, treatment option, controls chosen (Annex A ref), owner, residual score, target date, status>
Retained risks: <list with approver and date>
Risk treatment plan: <table: risk ID, action, control ref, owner, resources, due, evidence of completion>
Top ten by score: <plain-English summary for leadership>
To confirm: <unknown controls, missing owners, thresholds not yet set>
```

## Rules
- Never quote the standard's text; Annex A controls are cited by number and the user reads the wording in their licensed copy from BSI or ISO. Point to ISO/IEC 27005 for guidance; do not reproduce it.
- Every score has a written reason; no number appears without one.
- Retain is a decision by a named person, never the default for a risk nobody got round to.
- The skill never states that risk is "acceptable" or "managed"; the leadership decides and the auditor judges.
- Sharing a risk through a supplier or insurer never removes it from the register.
- British spelling. No em dashes.

Also in the ISO 27001 Readiness Pack