Skip to content
Academy ofAI Learning

Store / ISO 27001 Readiness Pack

Claude skill · Compliance and security

Management review and audit prep

Clause 9.3 pack and minutes, stage 1 and 2 readiness, evidence index and likely interview questions

When Claude uses it (the skill's own description)

Prepare the clause 9.3 management review pack and minutes, then certification audit readiness: what stages 1 and 2 look at, the evidence index by clause, interview questions for leaders, IT and staff, and common nonconformity causes. Use when asked to "prepare the management review", "get ready for stage 1" or "what will the auditor ask". Works from ISMS records, SoA, findings and action logs.

iso-27001-readiness/skills/management-review-and-audit-prep/SKILL.md

The skill, as Claude reads it

Plain text you can open, read and edit.

# Management review and audit preparation

An auditor checks that the top team genuinely reviews the ISMS and decides things, and that evidence for every clause can be shown quickly. It answers: what goes to the leadership, what they decide, and what the certification audit will ask for.

## Collect first

1. **Previous management review** minutes and actions, with status.
2. **Changes** in issues and interested party requirements since the last review.
3. **Performance feedback**: nonconformities and corrective actions, measurement results, internal audit results, objectives met or missed.
4. **Feedback from interested parties**: customer questionnaires, complaints, regulator contact, supplier issues.
5. **Risk assessment results** and treatment plan status.
6. **Opportunities for improvement** raised by anyone.
7. **The certification body's plan**: stage dates, auditor days, scope wording, sites; ask for their audit plan and what they want in advance.
8. **Evidence** existing today, by clause, and where it lives.

## Method

1. **Review pack**: one section per input, each with a one-page summary, the data, and a proposed decision or "for noting". Add resources needed and ISMS changes proposed. The user checks the input list against clause 9.3 in their licensed copy.
2. **Agenda and minutes template**: attendees (the top team, not only IT), each input, discussion, decision, owner, date. Decisions are the outputs: improvement actions, ISMS changes, resources. Minutes signed and filed.
3. **Stage 1 readiness**: the documentation and readiness visit. The auditor typically reviews scope, context, policy, risk method and register, SoA, objectives, internal audit and management review records. Produce the document set with versions and approvals, and the open list.
4. **Stage 2 readiness**: the implementation audit. The auditor samples controls in operation, interviews staff and checks records over the period. Produce the operating evidence per applicable control: record, period covered, holder.
5. **Evidence index**: a table for clauses 4 to 10 and each Annex A theme: requirement in the organisation's words, document or record, location, owner, last updated, version. Gaps are "to produce" with a date.
6. **Interview preparation** in three sets. Top team: why the ISMS exists, the scope, the policy, the main risks, last review decisions, resources, objectives. IT: access granting and removal, patching, backups and restore tests, incidents, logging, change control, suppliers. Staff: where the policy is, how to report an incident, suspicious emails, screen locking, home working, the security contact. Honest answers, rehearsed; nobody is coached to say untrue things.
7. **Common nonconformity causes** to check: scope not matching reality; risk assessment not repeatable; SoA out of step with the register; policies without evidence of practice; internal audit missing or not independent; management review with no decisions; corrective actions without root cause or verification; leavers with live accounts; backups never restored; supplier contracts without security terms; untrained staff; objectives not measured. A yes or no with evidence for each.
8. **Audit day logistics**: opening meeting, a guide per site, a document runner, a findings log during the audit, and the response to findings within the certification body's timescales (confirm with them).

## Output

```
Management review pack: <section per input, summary, data, proposed decision>
Agenda and minutes: <template with decisions, owners, dates>
Stage 1 document set: <list with version, approval, status>
Stage 2 operating evidence: <control ref, record, period, holder>
Evidence index by clause: <table>
Interview question bank: <top team / IT / staff, with the honest answer to prepare>
Nonconformity cause checklist: <cause, present Y/N, evidence, action>
Open items: <to produce, owner, date>
Questions for the certification body: <audit plan, sampling, response timescales>
```

## Rules
- Never reproduce the standard's text; the user confirms the clause 9.3 inputs and outputs in their licensed copy from BSI or ISO.
- Never say the organisation "will pass", "is certified" or "is compliant". The certification body decides; the skill prepares evidence and people.
- Staff are prepared with the truth; no answer is drafted that evidence does not support.
- Minutes record only decisions actually taken by those present.
- Audit arrangements vary by certification body; confirm the plan with yours.
- British spelling. No em dashes.

Also in the ISO 27001 Readiness Pack